AI Pilot Charter Template

Agree on the work to test, who is accountable, what evidence matters, and when to pause or stop.

How to use this charter

Use this document to agree on a bounded AI trial before changing a shared process or using company data. It can cover one task or a small set of related tasks; there is no required number of use cases. A personal experiment may use a shorter version. Follow your organization's approval and data-handling rules.

1. Work and scope

  • Task and process owner:
  • People affected or participating:
  • Current steps and main difficulty:
  • What is included in this trial:
  • What is out of scope:
  • Start/end dates and review date:

2. Intended result and evidence

FieldRecord
Outcome to improveSpeed, quality, consistency, service, risk or another defined outcome
BaselineStarting value, sample, period, method and source; mark measured, estimated or assumed
Target or acceptance criteriaWhat must improve and what quality/safety conditions must still pass
ComparisonHow the current method and AI-assisted method will be compared fairly
CostsTool cost and time spent preparing, reviewing, correcting and maintaining

Do not describe an estimate or target as an achieved result. Include review and correction time, not just the time to generate a draft.

3. People and decisions

  • Business owner: accountable for the work outcome.
  • Data/source owner: confirms that the information may be used for this trial.
  • Reviewer or approver: checks results or authorizes changes when policy requires it.
  • Technical/support contact: helps with setup or incidents, if relevant.
  • Decision authority: who can continue, change scope, pause, resume or stop the trial?

One person may hold more than one role in a small trial. Record any role that must remain independent.

4. Information, tools and limits

  • Approved tool, account and environment:
  • Information allowed for use and its source:
  • Information that must not be entered:
  • AI may draft/analyze:
  • AI must not decide or do:
  • Checks required before anyone relies on or shares an output:
  • Where a person takes over:

5. Test and operating plan

CaseExpected result or required checkOwnerOutcome / evidence
Normal case
Missing or conflicting information
High-impact or out-of-scope case
Tool/source failure
  • Fallback to the current process:
  • Stop condition:
  • How to report and investigate an incident:
  • What evidence to retain and for how long:

6. Approval and decision log

DecisionName/roleDateConditions or evidence
Trial may start
Scope changed / paused / resumed / stopped
Final review

Approval means the named person authorized the stated scope; it does not establish that the trial is effective, safe in every context or legally compliant.

Worked plan and copyable record

Use E1's fictional inputs, not real customer records.

FieldProposed plan
WorkInternal order-status draft; no customer send or refund
OwnersLan reviews; Mai confirms policy applicability; IT checks tools/access; business owner approves the company trial
SourcesApplicable K1; unresolved K0/K1 differences go to Mai; exclude H1
TestsE01-E06; preserve IDs, pending versus paid, no unverified date promise
AccessPermitted order lookup only; stop on denied access, no automatic retry
Proposed limitsTwo calls, 30 seconds or 0.10 USD per case, whichever is reached first
AcceptanceCount completed outputs separately from safety tests; required refusal can pass a safety test
RecoveryPause affected route, verify evidence, retest; authorized owner decides resumption

These are exercise proposals, not observed results or automatic enforcement. A prompt does not enforce access. Confirm system controls before an integration test.

Task / personal or team scope / dates:
Included / excluded work:
Baseline / source / measured, estimated or assumed:
Target / quality and safety criteria:
Comparable cases / timing boundaries:
Allowed data, tools, account / prohibited actions:
Prompt, Skill, workflow or agent version, if used:
Reviewer / data owner / technical contact:
Budget, time, calls / stop / fallback:
Incident contact / permitted evidence / retention:
Decision authority / approval status / date / conditions:
Next review date:

Use relevant fields only for personal practice. Include checking, corrections and failed attempts in work time; itemize setup and tool costs without double counting. No baseline or target is assumed to have been measured. Keep criteria in the trial log and evidence in the closing report.